← Across institutions01 of 06←→
Coming
What Was Agreed About a Poor Result?
Before results are known, map favorable, mixed, and poor findings to feasible actions. Include transition responsibilities, safeguards, and legitimate exceptions. Preserve the decision-maker's authority to depart from the rule, but require a recorded reason rather than a silent override.
- Access
- In the collection, with an organization subscription, when the collection is released.
- Length
- About 5 minutes to read